4.6.2.8 Shock. To determine conformance to 3.4.8, the pump assembly shall be mounted
by normal mounting provisions to a shock machine capable of producing the shock pulse shown in
figure 1. Three sawtooth shocks of 40 g and time duration of 11 ms (see figure 1) in each
direction shall be applied along three mutually perpendicular axes of the pump (total of
18 shocks). After the shock test, the pump assembly shall be examined for evidence of damage or
deformation and performance degradation (see 4.2.1).