Dear YG,
Please find attached link of Data report with most of the comment included.
The reason why some item appeared 2 times in visual and dimensional certificate after concrete is linked to the fact that few of these item had a concrete non acceptable after our QC inspection and same parts went to company Distrisol for a new concrete feeding.
Radiographic certificate have been modified as per comment.
The only thing which is not in the data book (attached link) is PMI report.
There were two comments for client:
Some item which appear 2 times= reason is the same as above and linked to a concrete feeding made 2 times.
The other point is lack to PMI result on 3 parts E6, F5 and F6.
There is doubt there: nobody knows if PMI has been done or not. If the test is done, there is PMI marked on the parts but they forgot to indicate results on certificate.
If not, there is no PMI marking of the part but since these part are coming from same heat as other parts which have PMI result, we assume there is no risk.
That’s the reason why our QC team do not include all PMI results in the data book. Thanks to give us your advice.
Best regards.