Good day!
Regarding this project, the result after check the FR42 no changing point in CO2 ROOM ARR’T for approval drawing,
I send revised drawing that is already considered. Please refer to FR.46 SECTION on enclosed drawing.
(before send drawing FR45 was miss wright ,FR 46 is correct)