A tube stocked on the in-rack is moved to the entry conveyer by the kicker. This tube is forwarded to the pinch roller(2nd feeding device) with rotating by means of the driven unit at front of the entry conveyer. Then the pressure roller presses the tube so that the tube may not be vibrated from a long length of the tube. The pressure roller and the kicker are operated by air-cylinders.